All Projects

All Projects

School Name: Acceleration East

School Type: High

Project Type: Capital Renewal

Status: Closeout

Year: 2021

Attachments:


School Name: Acceleration East

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2002

Attachments:

School Name: Acceleration West

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2020

Attachments:​​​​​​​

School Name: Aloma ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2012

Attachments:​​​​​​​

School Name: Andover ES

School Type: Elementary

Project Type: Capital Renewal

Status: Design

Year: 2023

Attachments:


School Name: Andover ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2005

Attachments:​​​​​​​

School Name: Apopka 9th Grade Center

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2021

Attachments:​​​​​​​

School Name: Apopka ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2015

Attachments:​​​​​​​


School Name: Apopka ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2007

Attachments:

School Name: Apopka MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:​​​​​​​

School Name: Apopka HS

School Type: High

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Apopka HS

School Type: High

Project Type: Replacement

Status: Complete

Year: 2009

Attachments:​​​​​​​

School Name: Arbor Ridge K-8

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Construction

Year: 2023

Attachments:


School Name: Arbor Ridge K-8

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2013

Attachments:

School Name: Atwater Bay Elementary (Site 47-E-W-4)

School Type: Elementary

Project Type: New/Relief

Status: Construction

Year: 2024

Attachments:

School Name: Audubon Park

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2018

Attachments:

School Name: Audubon Park School

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2018

Attachments:

School Name: Avalon Center for Technical Excellence

School Type: Vocational/Other

Project Type: New/Relief

Status: Complete

Year: 2007

Attachments:

School Name: Avalon ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2026

Attachments:


School Name: Avalon ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2001

Attachments:

School Name: Avalon MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Construction

Year: 2023

Attachments:


School Name: Avalon MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Azalea Park ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Baldwin Park ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2007

Attachments:

School Name: Bay Lake ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2016

Attachments:

School Name: Bay Meadows ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2006

Attachments:

School Name: Blankner School

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Construction

Year: 2021

Attachments:


School Name: Blankner School

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2002

Attachments:

School Name: Bonneville ES

School Type: Elementary

Project Type: Capital Renewal

Status: Design

Year: 2023

Attachments:


School Name: Bonneville ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2007

Attachments:

School Name: Boone High

School Type: High

Project Type: Comprehensive Renovation

Status: Planning

Year: 2027

Attachments:


School Name: Boone HS

School Type: High

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Boone HS

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Boone HS

School Type: High

Project Type: Replacement

Status: Complete

Year: 2020

Attachments:


School Name: Boone HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2020

Attachments:


School Name: Boone HS

School Type: High

Project Type: Replacement

Status: Complete

Year: 2019

Attachments:


School Name: Boone HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2004

Attachments:

School Name: Bridgewater MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2007

Attachments:

School Name: Brookshire ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2013

Attachments:

School Name: Camelot ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2026

Attachments:


School Name: Camelot ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2001

Attachments:

School Name: Carver MS

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:

School Name: Castle Creek ES

School Type: Elementary

Project Type: Capital Renewal

Status: Construction

Year: 2023

Attachments:


School Name: Castle Creek ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Castleview ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2019

Attachments:

School Name: Catalina ES

School Type: Elementary

Project Type: Capital Renewal

Status: Construction

Year: 2023

Attachments:


School Name: Catalina ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2007

Attachments:

School Name: Chain of Lakes MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Planning

Year: 2026

Attachments:


School Name: Chain of Lakes MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Construction

Year: 2022

Attachments:


School Name: Chain of Lakes MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 1999

Attachments:

School Name: Cheney ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2006

Attachments:

School Name: Chickasaw ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:


School Name: Chickasaw ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2007

Attachments:

School Name: Citrus ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2026

Attachments:


School Name: Citrus ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2018

Attachments:


School Name: Citrus ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2000

Attachments:

School Name: Clay Springs ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2015

Attachments:

School Name: College Park MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:


School Name: College Park MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Complete

Year: 2018

Attachments:


School Name: College Park MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Colonial HS

School Type: High

Project Type: Comprehensive Renovation

Status: Design

Year: 2026

Attachments:


School Name: Colonial HS

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2019

Attachments:


School Name: Colonial HS

School Type: High

Project Type: Replacement

Status: Complete

Year: 2019

Attachments:


School Name: Colonial HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2003

Attachments:

School Name: Colonial Ninth Grade Center

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Colonial Ninth Grade Center

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2006

Attachments:

School Name: Columbia ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2007

Attachments:

School Name: Conway ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2008

Attachments:

School Name: Conway MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Corner Lake MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2019

Attachments:

School Name: Cypress Springs ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2012

Attachments:

School Name: Deerwood ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2019

Attachments:

School Name: Dillard Street ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2004

Attachments:

School Name: Discovery MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Discovery MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Complete

Year: 2021

Attachments:


School Name: Discovery MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2009

Attachments:

School Name: Dommerich ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2010

Attachments:

School Name: Dover Shores ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2018

Attachments:

School Name: Dr. Phillips ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:


School Name: Dr. Phillips ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Dr. Phillips HS

School Type: High

Project Type: Capital Renewal

Status: Construction

Year: 2024

Attachments:


School Name: Dr. Phillips HS

School Type: High

Project Type: Capital Renewal

Status: Design

Year: 2022

Attachments:


School Name: Dr. Phillips HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2015

Attachments:

School Name: Dream Lake ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2016

Attachments:

School Name: Eagle Creek ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2015

Attachments:

School Name: Eagle's Nest ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2003

Attachments:

School Name: East Lake ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2005

Attachments:

School Name: East River HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2009

Attachments:

School Name: Eccleston ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2013

Attachments:

School Name: Edgewater HS

School Type: High

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Edgewater HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Endeavor ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2026

Attachments:


School Name: Endeavor ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2000

Attachments:

School Name: Engelwood ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:

School Name: Evans HS

School Type: High

Project Type: Replacement

Status: Complete

Year: 2012

Attachments:

School Name: Forsyth Woods ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2010

Attachments:

School Name: Frangus ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2018

Attachments:

School Name: Freedom MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2005

Attachments:

School Name: Freedom HS

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Freedom HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2003

Attachments:

School Name: Glenridge MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Glenridge MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Construction

Year: 2021

Attachments:


School Name: Glenridge MS

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2003

Attachments:

School Name: Gotha MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Gotha MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Hamlin ES

School Type: Elementary

Project Type: New/Relief

Status: Construction

Year: 2022

Attachments:

School Name: Hamlin MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Construction

Year: 2022

Attachments:

School Name: Hiawassee ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2003

Attachments:

School Name: Hidden Oaks ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2018

Attachments:

School Name: Hillcrest ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2018

Attachments:

School Name: Horizon HS

School Type: High

Project Type: New/Relief

Status: Closeout

Year: 2021

Attachments:

School Name: Horizon West MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2019

Attachments:

School Name: Howard MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Construction

Year: 2025

Attachments:


School Name: Howard MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Design

Year: 2024

Attachments:


School Name: Howard MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2001

Attachments:

School Name: Hungerford ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2018

Attachments:

School Name: Hungerford ES (OTC - Eatonville)

School Type: Vocational/Other

Project Type: Comprehensive Renovation

Status: Construction

Year: 2023

Attachments:

School Name: Hunter's Creek ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:

School Name: Hunter's Creek MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:


School Name: Hunter's Creek MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Independence ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2015

Attachments:

School Name: Innovation High School (Site 50-H-SE-2)

School Type: High

Project Type: New/Relief

Status: Construction

Year: 2024

Attachments:

School Name: Innovation MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2017

Attachments:

School Name: Ivey Lane ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:

School Name: John Young ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Jones HS

School Type: High

Project Type: Capital Renewal

Status: Construction

Year: 2022

Attachments:


School Name: Jones HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2005

Attachments:

School Name: Keene's Crossing ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2009

Attachments:

School Name: Kelly Park School

School Type: Middle/K-8

Project Type: New/Relief

Status: Construction

Year: 2022

Attachments:

School Name: Killarney ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2008

Attachments:

School Name: Lake Buena Vista HS

School Type: High

Project Type: New/Relief

Status: Closeout

Year: 2021

Attachments:

School Name: Lake Como School

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2018

Attachments:

School Name: Lake Gem ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2019

Attachments:

School Name: Lake George ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2019

Attachments:

School Name: Lake Nona HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2009

Attachments:

School Name: Lake Silver ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2014

Attachments:

School Name: Lake Sybelia ES

School Type: Elementary

Project Type: Capital Renewal

Status: Planning

Year: 2021

Attachments:


School Name: Lake Sybelia ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Lake Weston ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2015

Attachments:

School Name: Lake Whitney ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2015

Attachments:

School Name: Lakemont ES

School Type: Elementary

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Lakemont ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2008

Attachments:

School Name: Lakeview MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Design

Year: 2026

Attachments:


School Name: Lakeview MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Construction

Year: 2022

Attachments:


School Name: Lakeview MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2005

Attachments:

School Name: Lakeville ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Lakeville ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Lancaster ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2013

Attachments:

School Name: Laureate Park ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2017

Attachments:

School Name: Lawton Chiles ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Planning

Year: 2026

Attachments:


School Name: Lawton Chiles ES

School Type: Elementary

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Lawton Chiles ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Lawton Chiles ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 1999

Attachments:

School Name: Legacy MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Design

Year: 2023

Attachments:


School Name: Legacy MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2005

Attachments:

School Name: Liberty MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Liberty MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2007

Attachments:

School Name: Little River ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Lockhart ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2016

Attachments:

School Name: Lockhart MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Lockhart MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Lovell ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2015

Attachments:

School Name: Site 130-E-SE-2

School Type: Elementary

Project Type: New/Relief

Status: Construction

Year: 2025

Attachments:

School Name: Luminary Middle School (Site 129-M-SE-2)

School Type: Middle/K-8

Project Type: New/Relief

Status: Construction

Year: 2024

Attachments:

School Name: Magnolia School/Silver Pines Academy K-12 Learning Center

School Type: Vocational/Other

Project Type: Replacement

Status: Closeout

Year: 2021

Attachments:

School Name: Maitland MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Maxey ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2018

Attachments:

School Name: McCoy ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2005

Attachments:

School Name: Meadow Woods ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:

School Name: Meadow Woods MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Closeout

Year: 2021

Attachments:

School Name: Meadowbrook MS

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2006

Attachments:

School Name: Memorial MS

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2009

Attachments:

School Name: Metrowest ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Metrowest Primary Learning Center

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 1999

Attachments:

School Name: Millennia ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Millennia Gardens ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2016

Attachments:

School Name: Mollie Ray ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:

School Name: Moss Park ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2007

Attachments:

School Name: Northlake Park Community School

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Northlake Park Community School

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 1999

Attachments:

  • Final Update

School Name: Northlake Park ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Construction

Year: 2026

Attachments:

School Name: Oak Hill ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:

School Name: Oak Ridge HS

School Type: High

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:


School Name: Oak Ridge HS

School Type: High

Project Type: Replacement

Status: Complete

Year: 2013

Attachments:

School Name: Oakshire ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Planning

Year: 2026

Attachments:


School Name: Oakshire ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Oakshire ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 1999

Attachments:

School Name: Ocoee ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Ocoee MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Planning

Year: 2025

Attachments:


School Name: Ocoee MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Ocoee MS

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2001

Attachments:

School Name: Ocoee HS

School Type: High

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Ocoee HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2005

Attachments:

School Name: OCPS Academic Center for Excellence (ACE)

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2017

Attachments:

School Name: Odyssey MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Complete

Year: 2019

Attachments:


School Name: Odyssey MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Complete

Year: 2017

Attachments:


School Name: Odyssey MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2001

Attachments:

School Name: Olympia HS

School Type: High

Project Type: Comprehensive Renovation

Status: Planning

Year: 2027

Attachments:


School Name: Olympia HS

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Olympia HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2007

Attachments:


School Name: Olympia HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2001

Attachments:

School Name: Orange Center ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2023

Attachments:

 

School Name: Orange Technical College (Formerly OTC - Orlando)

School Type: Vocational/Other

Project Type: Comprehensive Renovation

Status: Construction

Year: 2023

Attachments:

School Name: Orlo Vista ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2004

Attachments:

School Name: OTC - Apopka Campus (Site 204-AE-N-7)

School Type: Vocational/Other

Project Type: Capital Renewal

Status: Design

Year: 2022

Attachments:

School Name: OTC - East Campus (Site 512-T-E-1)

School Type: Vocational/Other

Project Type: Replacement

Status: Construction

Year: 2024

Attachments:

School Name: OTC - South Campus (Formerly Mid-Florida Tech)

School Type: Vocational/Other

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:

School Name: OTC West Campus (Site 73-T-W-7) Formerly Westside Tech

School Type: Vocational/Other

Project Type: Replacement

Status: Construction

Year: 2024

Attachments:

School Name: Palm Lake ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Palmetto ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Planning

Year: 2026

Attachments:


School Name: Palmetto Elementary Addition

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2000

Attachments:

  • Final Update

School Name: Panther Lake Elementary

School Type: Elementary

Project Type: New/Relief

Status: Construction

Year: 2022

Attachments:

School Name: Pershing School

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2019

Attachments:

School Name: Piedmont Lakes MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Piedmont Lakes MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Piedmont Lakes MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Pinar ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2020

Attachments:

School Name: Pine Hills ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2018

Attachments:

School Name: Pine Hills Transportation Center

School Type: Vocational/Other

Project Type: Comprehensive Renovation

Status: Complete

Year: 2019

Attachments:

School Name: Pineloch ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2014

Attachments:

School Name: Pinewood ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Pinewood ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Positive Pathways Transition Center

School Type: Vocational/Other

Project Type: New/Relief

Status: Complete

Year: 2002

Attachments:

School Name: Prairie Lake ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2013

Attachments:

School Name: Princeton ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2012

Attachments:


School Name: Princeton ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2007

Attachments:

School Name: Ridgewood Park ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Ridgewood Park ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2006

Attachments:

School Name: Riverdale ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2020

Attachments:


School Name: Riverdale ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2010

Attachments:

School Name: Riverside ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2016

Attachments:


School Name: Riverside ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2007

Attachments:

School Name: Roberto Clemente MS (former Jackson MS)

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Design

Year: 2023

Attachments:


School Name: Roberto Clemente MS (former Jackson MS)

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2007

Attachments:

School Name: Robinswood MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2009

Attachments:

School Name: Rock Lake ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:

School Name: Rock Springs ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2013

Attachments:

School Name: Rolling Hills ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2020

Attachments:

School Name: Rosemont ES

School Type: Elementary

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Rosemont ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Sadler ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2007

Attachments:

School Name: Sally Ride ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2018

Attachments:

School Name: Sand Lake ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2005

Attachments:

School Name: Shenandoah ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2008

Attachments:

School Name: Shingle Creek ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Site 97-E-SE-2 Greenfield School

School Type: Elementary

Project Type: New/Relief

Status: Construction

Year: 2025

Attachments:

School Name: South Creek MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Southwest MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2020

Attachments:


School Name: Southwest MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2006

Attachments:

School Name: Southwood ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2019

Attachments:


School Name: Southwood ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Spring Lake ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Stone Lakes ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Stonewyck Elementary

School Type: Elementary

Project Type: New/Relief

Status: Construction

Year: 2022

Attachments:

School Name: Summerlake ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2020

Attachments:

School Name: Sun Blaze ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2013

Attachments:

School Name: SunRidge ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2012

Attachments:

School Name: SunRidge MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2012

Attachments:

School Name: Sunrise ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2019

Attachments:

School Name: Sunset Park ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2007

Attachments:

School Name: Sunshine ES

School Type: Elementary

Project Type: New/Relief

Status: Closeout

Year: 2020

Attachments:

School Name: Tangelo Park ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2016

Attachments:

School Name: Thornebrooke ES

School Type: Elementary

Project Type: Capital Renewal

Status: Design

Year: 2022

Attachments:


School Name: Thornebrooke ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2002

Attachments:

School Name: Three Points ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:


School Name: Three Points ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2001

Attachments:

School Name: Tildenville ES

School Type: Elementary

Project Type: Capital Renewal

Status: Planning

Year: 2024

Attachments:


School Name: Tildenville ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2006

Attachments:

School Name: Timber Creek HS

School Type: High

Project Type: Comprehensive Renovation

Status: Planning

Year: 2027

Attachments:


School Name: Timber Creek HS

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2022

Attachments:


School Name: Timber Creek HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2001

Attachments:

School Name: Timber Lakes ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2008

Attachments:

School Name: Timber Springs MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2017

Attachments:


School Name: Timber Springs MS

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2017

Attachments:

School Name: Union Park ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2018

Attachments:

School Name: Union Park MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Union Park MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2008

Attachments:

School Name: University HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2012

Attachments:

School Name: Ventura ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2017

Attachments:


School Name: Ventura ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2016

Attachments:

School Name: Village Park ES

School Type: Elementary

Project Type: New/Relief

Status: Closeout

Year: 2021

Attachments:

School Name: Vista Lakes ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Vista Pointe ES

School Type: Elementary

Project Type: New/Relief

Status: Closeout

Year: 2020

Attachments:

School Name: Walker MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2012

Attachments:

School Name: Washington Shores ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Washington Shores PLC

School Type: Vocational/Other

Project Type: Capital Renewal

Status: Design

Year: 2022

Attachments:

School Name: Water Spring ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2019

Attachments:

School Name: Water Spring MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Construction

Year: 2023

Attachments:

School Name: Waterbridge ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Waterford ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2014

Attachments:

School Name: Wedgefield School

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2016

Attachments:

School Name: Wekiva HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2007

Attachments:

School Name: West Creek ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2004

Attachments:

School Name: West Oaks ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2004

Attachments:

School Name: West Orange HS

School Type: High

Project Type: Replacement

Status: Complete

Year: 2009

Attachments:

School Name: Westbrooke ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2008

Attachments:

School Name: Westpointe ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2017

Attachments:

School Name: Westridge MS

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:


School Name: Westridge MS

School Type: Middle/K-8

Project Type: Replacement

Status: Complete

Year: 2013

Attachments:

School Name: Wetherbee ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2011

Attachments:

School Name: Wheatley ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2014

Attachments:

School Name: Whispering Oak ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Design

Year: 2025

Attachments:


School Name: Whispering Oak ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2005

Attachments:

School Name: Windermere ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2007

Attachments:

School Name: Windermere HS

School Type: High

Project Type: Replacement

Status: Construction

Year: 2024

Attachments:


School Name: Windermere HS

School Type: High

Project Type: New/Relief

Status: Complete

Year: 2017

Attachments:

School Name: Windy Ridge School

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Planning

Year: 2023

Attachments:


School Name: Windy Ridge K-8

School Type: Middle/K-8

Project Type: Comprehensive Renovation

Status: Complete

Year: 2006

Attachments:

School Name: Winegard ES

School Type: Elementary

Project Type: Replacement

Status: Complete

Year: 2020

Attachments:

School Name: Winter Park 9th Grade Center

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2011

Attachments:

School Name: Winter Park HS

School Type: High

Project Type: Comprehensive Renovation

Status: Design

Year: 2026

Attachments:


School Name: Winter Park HS

School Type: High

Project Type: Capital Renewal

Status: Complete

Year: 2017

Attachments:


School Name: Winter Park HS

School Type: High

Project Type: Comprehensive Renovation

Status: Complete

Year: 2006

Attachments:

School Name: Wolf Lake ES

School Type: Elementary

Project Type: Capital Renewal

Status: Complete

Year: 2018

Attachments:


School Name: Wolf Lake ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Wolf Lake MS

School Type: Middle/K-8

Project Type: Capital Renewal

Status: Closeout

Year: 2022

Attachments:


School Name: Wolf Lake MS

School Type: Middle/K-8

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:

School Name: Wyndham Lakes ES

School Type: Elementary

Project Type: New/Relief

Status: Complete

Year: 2006

Attachments:​​​​​​​

School Name: Zellwood ES

School Type: Elementary

Project Type: Comprehensive Renovation

Status: Complete

Year: 2012

Attachments:​​​​​​​