Apache Airflow

PyPI version GitHub Build Coverage Status License PyPI - Python Version Docker Pulls Docker Stars PyPI - Downloads Artifact HUB Code style: black Twitter Follow Slack Status

Apache Airflow (or simply Airflow) is a platform to programmatically author, schedule, and monitor workflows.

When workflows are defined as code, they become more maintainable, versionable, testable, and collaborative.

Use Airflow to author workflows as directed acyclic graphs (DAGs) of tasks. The Airflow scheduler executes your tasks on an array of workers while following the specified dependencies. Rich command line utilities make performing complex surgeries on DAGs a snap. The rich user interface makes it easy to visualize pipelines running in production, monitor progress, and troubleshoot issues when needed.

Table of contents

Project Focus

Airflow works best with workflows that are mostly static and slowly changing. When the DAG structure is similar from one run to the next, it clarifies the unit of work and continuity. Other similar projects include Luigi, Oozie and Azkaban.

Airflow is commonly used to process data, but has the opinion that tasks should ideally be idempotent (i.e., results of the task will be the same, and will not create duplicated data in a destination system), and should not pass large quantities of data from one task to the next (though tasks can pass metadata using Airflow's Xcom feature). For high-volume, data-intensive tasks, a best practice is to delegate to external services specializing in that type of work.

Airflow is not a streaming solution, but it is often used to process real-time data, pulling data off streams in batches.

Principles

  • Dynamic: Airflow pipelines are configuration as code (Python), allowing for dynamic pipeline generation. This allows for writing code that instantiates pipelines dynamically.
  • Extensible: Easily define your own operators, executors and extend the library so that it fits the level of abstraction that suits your environment.
  • Elegant: Airflow pipelines are lean and explicit. Parameterizing your scripts is built into the core of Airflow using the powerful Jinja templating engine.
  • Scalable: Airflow has a modular architecture and uses a message queue to orchestrate an arbitrary number of workers.

Requirements

Apache Airflow is tested with:

Main version (dev) Stable version (2.2.4)
Python 3.7, 3.8, 3.9 3.6, 3.7, 3.8, 3.9
Kubernetes 1.20, 1.21 1.18, 1.19, 1.20
PostgreSQL 10, 11, 12, 13 9.6, 10, 11, 12, 13
MySQL 5.7, 8 5.7, 8
SQLite 3.15.0+ 3.15.0+
MSSQL(Experimental) 2017, 2019

Note: MySQL 5.x versions are unable to or have limitations with running multiple schedulers -- please see the Scheduler docs. MariaDB is not tested/recommended.

Note: SQLite is used in Airflow tests. Do not use it in production. We recommend using the latest stable version of SQLite for local development.

Note: Python v3.10 is not supported yet. For details, see #19059.

Note: Airflow currently can be run on POSIX-compliant Operating Systems. For development it is regularly tested on fairly modern Linux Distros and recent versions of MacOS. On Windows you can run it via WSL2 (Windows Subsystem for Linux 2) or via Linux Containers. The work to add Windows support is tracked via #10388 but it is not a high priority. You should only use Linux-based distros as "Production" execution environment as this is the only environment that is supported. The only distro that is used in our CI tests and that is used in the Community managed DockerHub image is Debian Bullseye.

Getting started

Visit the official Airflow website documentation (latest stable release) for help with installing Airflow, getting started, or walking through a more complete tutorial.

Note: If you're looking for documentation for the main branch (latest development branch): you can find it on s.apache.org/airflow-docs.

For more information on Airflow Improvement Proposals (AIPs), visit the Airflow Wiki.

Documentation for dependent projects like provider packages, Docker image, Helm Chart, you'll find it in the documentation index.

Installing from PyPI

We publish Apache Airflow as apache-airflow package in PyPI. Installing it however might be sometimes tricky because Airflow is a bit of both a library and application. Libraries usually keep their dependencies open, and applications usually pin them, but we should do neither and both simultaneously. We decided to keep our dependencies as open as possible (in setup.py) so users can install different versions of libraries if needed. This means that pip install apache-airflow will not work from time to time or will produce unusable Airflow installation.

To have repeatable installation, however, we keep a set of "known-to-be-working" constraint files in the orphan constraints-main and constraints-2-0 branches. We keep those "known-to-be-working" constraints files separately per major/minor Python version. You can use them as constraint files when installing Airflow from PyPI. Note that you have to specify correct Airflow tag/version/branch and Python versions in the URL.

  1. Installing just Airflow:

Note: Only pip installation is currently officially supported.

While it is possible to install Airflow with tools like Poetry or pip-tools, they do not share the same workflow as pip - especially when it comes to constraint vs. requirements management. Installing via Poetry or pip-tools is not currently supported.

If you wish to install Airflow using those tools, you should use the constraint files and convert them to the appropriate format and workflow that your tool requires.

pip install 'apache-airflow==2.2.4' \
 --constraint "https://raw.githubusercontent.com/apache/airflow/constraints-2.2.4/constraints-3.7.txt"
  1. Installing with extras (i.e., postgres, google)
pip install 'apache-airflow[postgres,google]==2.2.4' \
 --constraint "https://raw.githubusercontent.com/apache/airflow/constraints-2.2.4/constraints-3.7.txt"

For information on installing provider packages, check providers.

Official source code

Apache Airflow is an Apache Software Foundation (ASF) project, and our official source code releases:

Following the ASF rules, the source packages released must be sufficient for a user to build and test the release provided they have access to the appropriate platform and tools.

Convenience packages

There are other ways of installing and using Airflow. Those are "convenience" methods - they are not "official releases" as stated by the ASF Release Policy, but they can be used by the users who do not want to build the software themselves.

Those are - in the order of most common ways people install Airflow:

  • PyPI releases to install Airflow using standard pip tool
  • Docker Images to install airflow via docker tool, use them in Kubernetes, Helm Charts, docker-compose, docker swarm, etc. You can read more about using, customising, and extending the images in the Latest docs, and learn details on the internals in the IMAGES.rst document.
  • Tags in GitHub to retrieve the git project sources that were used to generate official source packages via git

All those artifacts are not official releases, but they are prepared using officially released sources. Some of those artifacts are "development" or "pre-release" ones, and they are clearly marked as such following the ASF Policy.

User Interface

  • DAGs: Overview of all DAGs in your environment.

    DAGs

  • Tree: Tree representation of a DAG that spans across time.

    Tree

  • Graph: Visualization of a DAG's dependencies and their current status for a specific run.

    Graph

  • Task Duration: Total time spent on different tasks over time.

    Task Duration

  • Gantt: Duration and overlap of a DAG.

    Gantt

  • Code: Quick way to view source code of a DAG.

    Code

Semantic versioning

As of Airflow 2.0.0, we support a strict SemVer approach for all packages released.

There are few specific rules that we agreed to that define details of versioning of the different packages:

  • Airflow: SemVer rules apply to core airflow only (excludes any changes to providers). Changing limits for versions of Airflow dependencies is not a breaking change on its own.
  • Airflow Providers: SemVer rules apply to changes in the particular provider's code only. SemVer MAJOR and MINOR versions for the packages are independent of the Airflow version. For example, google 4.1.0 and amazon 3.0.3 providers can happily be installed with Airflow 2.1.2. If there are limits of cross-dependencies between providers and Airflow packages, they are present in providers as install_requires limitations. We aim to keep backwards compatibility of providers with all previously released Airflow 2 versions but there will sometimes be breaking changes that might make some, or all providers, have minimum Airflow version specified. Change of that minimum supported Airflow version is a breaking change for provider because installing the new provider might automatically upgrade Airflow (which might be an undesired side effect of upgrading provider).
  • Airflow Helm Chart: SemVer rules apply to changes in the chart only. SemVer MAJOR and MINOR versions for the chart are independent from the Airflow version. We aim to keep backwards compatibility of the Helm Chart with all released Airflow 2 versions, but some new features might only work starting from specific Airflow releases. We might however limit the Helm Chart to depend on minimal Airflow version.
  • Airflow API clients: SemVer MAJOR and MINOR versions follow MAJOR and MINOR versions of Airflow. The first MAJOR or MINOR X.Y.0 release of Airflow should always be followed by X.Y.0 release of all clients. The clients then can release their own PATCH releases with bugfixes, independently of Airflow PATCH releases.

Version Life Cycle

Apache Airflow version life cycle:

Version Current Patch/Minor State First Release Limited Support EOL/Terminated
2 2.2.4 Supported Dec 17, 2020 TBD TBD
1.10 1.10.15 EOL Aug 27, 2018 Dec 17, 2020 June 17, 2021
1.9 1.9.0 EOL Jan 03, 2018 Aug 27, 2018 Aug 27, 2018
1.8 1.8.2 EOL Mar 19, 2017 Jan 03, 2018 Jan 03, 2018
1.7 1.7.1.2 EOL Mar 28, 2016 Mar 19, 2017 Mar 19, 2017

Limited support versions will be supported with security and critical bug fix only. EOL versions will not get any fixes nor support. We always recommend that all users run the latest available minor release for whatever major version is in use. We highly recommend upgrading to the latest Airflow major release at the earliest convenient time and before the EOL date.

Support for Python and Kubernetes versions

As of Airflow 2.0, we agreed to certain rules we follow for Python and Kubernetes support. They are based on the official release schedule of Python and Kubernetes, nicely summarized in the Python Developer's Guide and Kubernetes version skew policy.

  1. We drop support for Python and Kubernetes versions when they reach EOL. We drop support for those EOL versions in main right after EOL date, and it is effectively removed when we release the first new MINOR (Or MAJOR if there is no new MINOR version) of Airflow For example, for Python 3.7 it means that we will drop support in main right after 27.06.2023, and the first MAJOR or MINOR version of Airflow released after will not have it.

  2. The "oldest" supported version of Python/Kubernetes is the default one until we decide to switch to later version. "Default" is only meaningful in terms of "smoke tests" in CI PRs, which are run using this default version and the default reference image available. Currently apache/airflow:latest and apache/airflow:2.2.4 images are Python 3.7 images. This means that default reference image will become the default at the time when we start preparing for dropping 3.7 support which is few months before the end of life for Python 3.7.

  3. We support a new version of Python/Kubernetes in main after they are officially released, as soon as we make them work in our CI pipeline (which might not be immediate due to dependencies catching up with new versions of Python mostly) we release new images/support in Airflow based on the working CI setup.

Base OS support for reference Airflow images

The Airflow Community provides conveniently packaged container images that are published whenever we publish an Apache Airflow release. Those images contain:

  • Base OS with necessary packages to install Airflow (stable Debian OS)
  • Base Python installation in versions supported at the time of release for the MINOR version of Airflow released (so there could be different versions for 2.3 and 2.2 line for example)
  • Libraries required to connect to suppoerted Databases (again the set of databases supported depends on the MINOR version of Airflow.
  • Predefined set of popular providers (for details see the Dockerfile).
  • Possibility of building your own, custom image where the user can choose their own set of providers and libraries (see Building the image)
  • In the future Airflow might also support a "slim" version without providers nor database clients installed

The version of the base OS image is the stable version of Debian. Airflow supports using all currently active stable versions - as soon as all Airflow dependencies support building, and we set up the CI pipeline for building and testing the OS version. Approximately 6 months before the end-of-life of a previous stable version of the OS, Airflow switches the images released to use the latest supported version of the OS. For example since Debian Buster end-of-life is August 2022, Airflow switches the images in main branch to use Debian Bullseye in February/March 2022. The version will be used in the next MINOR release after the switch happens. In case of the Bullseye switch - 2.3.0 version will use Bullseye. The images released in the previous MINOR version continue to use the version that all other releases for the MINOR version used.

Users will continue to be able to build their images using stable Debian releases until the end of life and building and verifying of the images happens in our CI but no unit tests are executed using this image in the main branch.

Approach to dependencies of Airflow

Airflow has a lot of dependencies - direct and transitive, also Airflow is both - library and application, therefore our policies to dependencies has to include both - stability of installation of application, but also ability to install newer version of dependencies for those users who develop DAGs. We developed the approach where constraints are used to make sure airflow can be installed in a repeatable way, while we do not limit our users to upgrade most of the dependencies. As a result we decided not to upper-bound version of Airflow dependencies by default, unless we have good reasons to believe upper-bounding them is needed because of importance of the dependency as well as risk it involves to upgrade specific dependency. We also upper-bound the dependencies that we know cause problems.

The constraint mechanism of ours takes care about finding and upgrading all the non-upper bound dependencies automatically (providing that all the tests pass). Our main build failures will indicate in case there are versions of dependencies that break our tests - indicating that we should either upper-bind them or that we should fix our code/tests to account for the upstream changes from those dependencies.

Whenever we upper-bound such a dependency, we should always comment why we are doing it - i.e. we should have a good reason why dependency is upper-bound. And we should also mention what is the condition to remove the binding.

Approach for dependencies for Airflow Core

Those extras and providers dependencies are maintained in setup.cfg.

There are few dependencies that we decided are important enough to upper-bound them by default, as they are known to follow predictable versioning scheme, and we know that new versions of those are very likely to bring breaking changes. We commit to regularly review and attempt to upgrade to the newer versions of the dependencies as they are released, but this is manual process.

The important dependencies are:

  • SQLAlchemy: upper-bound to specific MINOR version (SQLAlchemy is known to remove deprecations and introduce breaking changes especially that support for different Databases varies and changes at various speed (example: SQLAlchemy 1.4 broke MSSQL integration for Airflow)
  • Alembic: it is important to handle our migrations in predictable and performant way. It is developed together with SQLAlchemy. Our experience with Alembic is that it very stable in MINOR version
  • Flask: We are using Flask as the back-bone of our web UI and API. We know major version of Flask are very likely to introduce breaking changes across those so limiting it to MAJOR version makes sense
  • werkzeug: the library is known to cause problems in new versions. It is tightly coupled with Flask libraries, and we should update them together

Approach for dependencies in Airflow Providers and extras

Those extras and providers dependencies are maintained in setup.py.

By default, we should not upper-bound dependencies for providers, however each provider's maintainer might decide to add additional limits (and justify them with comment)

Support for providers

Providers released by the community have limitation of a minimum supported version of Airflow. The minimum version of Airflow is the MINOR version (2.1, 2.2 etc.) indicating that the providers might use features that appeared in this release. The default support timespan for the minimum version of Airflow (there could be justified exceptions) is that we increase the minimum Airflow version, when 12 months passed since the first release for the MINOR version of Airflow.

For example this means that by default we upgrade the minimum version of Airflow supported by providers to 2.2.0 in the first Provider's release after 21st of May 2022 (21st of May 2021 is the date when the first PATCHLEVEL of 2.1 (2.1.0) has been released.

Contributing

Want to help build Apache Airflow? Check out our contributing documentation.

Official Docker (container) images for Apache Airflow are described in IMAGES.rst.

Who uses Apache Airflow?

More than 400 organizations are using Apache Airflow in the wild.

Who Maintains Apache Airflow?

Airflow is the work of the community, but the core committers/maintainers are responsible for reviewing and merging PRs as well as steering conversations around new feature requests. If you would like to become a maintainer, please review the Apache Airflow committer requirements.

Can I use the Apache Airflow logo in my presentation?

Yes! Be sure to abide by the Apache Foundation trademark policies and the Apache Airflow Brandbook. The most up to date logos are found in this repo and on the Apache Software Foundation website.

Airflow merchandise

If you would love to have Apache Airflow stickers, t-shirt, etc. then check out Redbubble Shop.

Links

Sponsors

The CI infrastructure for Apache Airflow has been sponsored by:

astronomer.io AWS OpenSource