Jump to content

The Shops at Pickering City Centre

(Redirected from Pickering Town Centre)
The Shops at Pickering City Centre
Aerial view of Pickering Town Centre (2023)
Map
LocationPickering, Ontario, Canada
Coordinates43°50′08″N 79°05′10″W / 43.83552°N 79.08620°W / 43.83552; -79.08620
Address1355 Kingston Road
Opened1972
ManagementSalthill Property Management Inc.
Stores167[1]
6 (5 open, 1 in the process of redevelopment)
Floor area904,049 sq ft (83,988.9 m2)
Floors2
Websitewww.theshopsatpcc.com
Mall Atrium
Food Court

The Shops at Pickering City Centre (formerly known as Pickering Town Centre (PTC)) is a large regional shopping mall located in Pickering, Ontario, Canada. Opened in 1972 as Pickering Sheridan Mall, the mall has over 150 stores.

History

[edit]

The mall opened in 1972 as the Sheridan Mall with 80 stores. Its first significant renovations were in 1998.

The PTC underwent a $17 million renovation through 2008 and 2009.[2] This included new floors, ceilings, lighting and seating areas. It has a modern look and features an additional elevator.

On the morning of November 28, 2016, the Pickering Town Centre was flooded with water, causing the closure of the majority of the lower-level stores and Santa's Castle. The cause of the flooding was due to a broken water main.[3][4] Most stores had reopened by December 1, 2016.[5]

Following the closure of Target Canada in 2015, in 2017, the former Target store at the mall was replaced by three new stores, a Saks Off 5th outlet store, Cineplex Cinemas 11 and VIP movie theatre and a Farm Boy food market. In 2018 new stores were added, such as Winners/HomeSense and an Hakim Optical store. There are also redevelopment plans for the former Famous Players movie theatre and a Sears department store (under demolition to be replaced by condos[6]) at the mall.

In May 2024, the mall was renamed "The Shops at Pickering City Centre".[7]

A major redevelopment of the Shops at Pickering City Centre is underway as part of the Pickering City Centre master plan. Tower 1 is planned at 40 storeys and Tower 2 at 45 storeys, and both buildings are now under construction on the west side of the property. The towers include mixed use podiums and residential units and form the first phase of the new high density community planned around the mall and civic precinct.

The project also includes the plans to remove the Hudson’s Bay wing. This change will require several retailers in that corridor to relocate within the mall or close. Stores expected to be displaced include Bluenotes, Laura, Tip Top Tailors and SoftMoc.

Several new tenants have opened during the redevelopment period. Sephora and Chipotle Mexican Grill began operating in 2026, and the Lululemon pop up shop is now closed. The arrival of Splitsville is scheduled to open in fall 2026 in the former Saks Fifth Avenue unit near Entrance 3.

Anchors

[edit]

Former anchors

[edit]

References

[edit]
  1. "Pickering Town Centre Store Directory". www.pickeringtowncentre.com. Retrieved 2019-11-23.
  2. http://newsdurhamregion.com/news/Ajax/article/96595
  3. Kwong, Evelyn (28 November 2016). "Pickering Town Centre floods due to broken water main". Toronto Star. Retrieved 30 November 2016.
  4. Wilson, Codi (28 November 2016). "Crews clean up after flooding at Pickering Town Centre". CP24. Retrieved 30 November 2016.
  5. "UPDATE: Pickering Town Centre re-opens stores shut down by flood". DurhamRegion.com. 29 November 2016. Retrieved 30 November 2016.
  6. "Pickering Town Centre Redevelopment Master-Planned Community".
  7. "Pickering Town Centre to get a new name".
[edit]

New stores in 2025

[edit]

Stores that shutdown in 2025/2026

[edit]

New stores in 2026

[edit]