Daxing Jichang (Daxing Airport) station
Platform of Daxing Airport Subway Station | ||||||||||||||||||||||||||||||
| General information | ||||||||||||||||||||||||||||||
| Location | North Terminal (Terminal 1) of Beijing Daxing International Airport Guangyang District, Langfang, Hebei Province China | |||||||||||||||||||||||||||||
| Coordinates | 39°30′45″N 116°24′39″E / 39.51249°N 116.41071°E | |||||||||||||||||||||||||||||
| Operated by | Beijing Metro Operation Administration (BJMOA) Corp., Ltd. (Daxing Airport Express of Beijing Subway) China Railway Beijing Group (Beijing–Xiong'an intercity railway) | |||||||||||||||||||||||||||||
| Lines | Daxing Airport Express Beijing–Xiong'an intercity railway Tianjin–Daxing Airport intercity railway Huairou–Daxing Airport intercity railway | |||||||||||||||||||||||||||||
| Platforms | Subway: 2 (2 side platforms) Intercity Railway: 2 (1 island platform) | |||||||||||||||||||||||||||||
| Tracks | 4 | |||||||||||||||||||||||||||||
| Other information | ||||||||||||||||||||||||||||||
| Station code | China Railway: TMIS code: 21158 Telegram code: IWP Pinyin code: DXC | |||||||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||||||
| Opened | September 26, 2019[2][3] (subway station & railway station) | |||||||||||||||||||||||||||||
| Services | ||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
Daxing Jichang (Daxing Airport) station[a] (Chinese: 大兴机场站; pinyin: Dàxīng Jīchǎng zhàn)[1][4][5] is a station on the Daxing Airport Express of the Beijing Subway, and the Beijing–Xiong'an intercity railway, Tianjin–Daxing Airport intercity railway, and Huairou–Daxing Airport intercity railway of China Railway.
Opening time
[edit]The subway station for Daxing Airport Express of Beijing Subway opened on September 26, 2019.[2]
The railway station for Beijing–Xiong'an intercity railway also opened on September 26, 2019.[3] The railway station for Intercity Railway Connector opened in 2024.
Description
[edit]A ground transportation center was constructed beneath the North Terminal of Beijing Daxing International Airport.[6] Two underground railway stations (for Beijing–Xiong'an intercity railway and Intercity Railway Connector)[7] and three metro stations (Daxing Airport Express, Line 20 (Line R4) and another planned metro line)[7] were built beneath the North Terminal. Currently, only one of the metro lines (Daxing Airport Express) is in operation.
Gallery
[edit]Subway Station
[edit]-
Entrance of Daxing Airport Subway Station
-
Business class entrance of Daxing Airport Subway Station
Railway Station
[edit]-
Waiting room of Daxing Airport Railway Station
-
Platform and Sign of Daxing Airport Railway Station
-
Platform 1-2
Notes
[edit]References
[edit]- ^ a b c "北京地铁线路图". 北京地铁. Archived from the original on 2021-12-31.
- ^ a b "地铁大兴机场线明起运营,6条机场大巴线路同步开通". 2019-09-25.
- ^ a b "京雄城际铁路北京西至大兴机场段26日开通运营". 2019-09-25.
- ^ "北京市交通委:地铁新机场线明日起空载试运行". 2019-06-14.
- ^ "京雄城际铁路北京新机场站将更名为"大兴机场站"". 2019-08-08. Archived from the original on 2019-08-09. Retrieved 2019-08-09.
- ^ "大兴国际机场配套建设提速保通航". Archived from the original on September 29, 2019.
在航站楼地下二层,机场综合交通换乘中心也在加紧建设
- ^ a b "除了地铁新机场线,未来还有这些轨道线通往大兴机场". 2019-06-16.
...京雄城际、新机场线、R4线、预留轨道线、城际铁路联络线五线并设的大兴国际机场综合交通中心,使高铁、地铁与航站楼合一
