A.
It shall be unlawful for any person, firm or corporation to make an excavation or to place any form of construction in, over or upon any public road or street under the control of the Borough of Park Ridge or to otherwise endanger or obstruct the normal flow of traffic or the normal flow of surface water by the placing of any barricade, structure, material or equipment not normally designed to be operated, placed or used on the public road or street without first obtaining a written permit, issued and approved by the Construction Code Official, and upon payment of application fees as indicated in § 85-1B and § 85-13D and submission of escrow for professional services and deposits or bonds as indicated in § 85-5, Escrow; guaranty deposit or bond requirements, § 85-13E and § 85-13F. A permit shall be required for each and every street opening and excavation unless otherwise authorized by the Construction Code Official.
B.
An application fee shall be required for each and every street opening and excavation unless otherwise authorized by the Construction Code Official. An application fee shall be submitted in the amount of $250 for each street opening or excavation. For trench cuts, the application fee shall be $250 for the first of each street opening or excavation plus $20 per linear foot of trench. For fees associated with street openings and excavations by public utility companies, see § 85-13D.
C.
Street opening and excavation permits will not be issued between December 1 and March 1 unless an emergency exists as confirmed by the proper officials having jurisdiction over same.
D.
For street openings and excavations involving the installation of monitoring well(s), the requirements of the "Addendum to Street Opening Permit for the Installation of Monitoring Well(s) on Borough of Park Ridge Municipally Owned Property or in the Public Right-of-Way" appended at the end of this section shall also apply.[1] Where any sections of the addendum conflict with other sections indicated in Chapter 85, Street Openings and Excavations, the requirements of the addendum shall govern.
[1]
Editor's Note: Said addendum is on file in the Borough offices.
E.
The permit shall remain in effect until a restoration inspection certificate, as identified in § 85-6, for the permit has been issued.
F.
The Construction Code Official may exercise his or her right to immediately revoke the permit for failure to maintain the street opening or excavation area in a safe manner as indicated in § 85-10 and failure to submit and maintain appropriate application fees, escrow for professional services, and deposits or bonds as indicated in § 85-1A, as applicable.
G.
A permit for street openings and excavations does not carry with it any right to make drainage, sewer, water, gas, oil, steam, electric or telecom connections. A separate permit to make such connections must be obtained from the proper officials having jurisdiction over same.
H.
A permit shall not be transferred except upon prior written consent of the Construction Code Official.
I.
Copies of the permit shall be forwarded by the Construction Code Official to the Borough Engineer, Departments of Public Works, Utilities, Police and Fire of the pending street opening.